Sector ← Back to sectors

Marine
& Naval

Marine Propulsion Shaft Systems LATAM Waters Custom Sourcing
◆ Request Information ← All Sectors

01
Marine Propulsion Systems

PropellersShaft LinesOSV · Tug
02
Rudders & Steering Gear

High-liftSemi-spadeElectro-hydraulic
03
Industrial Cable Reels

MotorizedNavalSPM Available
04
SPM Sliprings — Naval

SPMFPSO3000A
→ View SPM catalogue
SEC-02 / Technical Questionnaires

Configuration Modules

Interactive PDF questionnaires for accurate technical configuration of marine propulsion packages. Download, fill in the relevant sections and return to info@explusultra.com — our engineering team will review with the manufacturer and respond within five working days.

M-01 PDF · 4 P · 86 F
Marine Propeller
Hélice marina · FPP / CPP

Propeller dimensioning: type (FPP/CPP/Voith), blades, diameter, material, skew, taper, engine duty rating, sea margin, light running margin and accessories (anode, fairing cone, rope cutter, boss cap).

Propulsion FPP / CPP Engine curve
Download PDF
M-02 PDF · 6 P · 134 F
Shaft Line · Stern Tube · Seals · Bearings
Línea de ejes · Bocina · Sellos · Apoyos

Integrated package: tail shaft and intermediate shaft specifications, stern tube construction and lubrication, fwd/aft seals (IMO MEPC.139(53) compliant), stern tube bearings, intermediate bearings and thrust bearing.

Shaft line IMO MEPC Bearings
Download PDF
M-03 PDF · 5 P · 123 F
Rudder & Steering Gear
Timón · Sistema de gobierno

Rudder configuration: architecture (spade, semi-balanced, Becker, Schilling), blade and stock specifications, steering gear with SOLAS II-1/29 redundancy and 28s hard-over time, bearings and seals.

Rudder SOLAS II-1/29 Steering
Download PDF
NOTE: Forms are interactive — open with Adobe Acrobat Reader or Foxit, fill in the fields, save and email back to info@explusultra.com. Spanish primary / English secondary. Class society documentation is requested per project.

LocationPanama City, Panama
WhatsApp
Your data is not shared with third parties.
✓ Enquiry sent. We will reply within 24 hours.